Home
About
Company Profile
Development process
Honor
Enterprise culture
Senior resume
Partners
Service
Laboratory Consulting
Laboratory Design
Laboratory Implementation
Laboratory operation and maintenance
Self-Developed
High Precision Environmental Control Equipment
Laboratory Environment Control Terminal
Cases
Colleges and universities
Scientific research institutions
Hospital
Public Health
Food and Drug Test
Measurement
Government Agencies
Enterprise Customer
Blog
News Courier
Boutique case
Honor Moment
Expand the big event
Staff World
Technical column
Industry Information
Contact
Join us
Team style
Contact Information
Online Contact
Expanding Technology · News Trends
2024-04-23
Design and Planning of Laboratory Strong and Weak Current System
The function of laboratory construction involves a number of complex process technologies such as water supply and drainage, ventilation and exhaust, strong and weak electricity, fire protection, collection and treatment of waste gas and waste liquid, and central heating and gas supply. Therefore, the construction of a key laboratory is a very complicated project. Today, Shuyu will tell you about the design and planning of the power distribution system.
Construction of Laboratory Strong and Weak Current System
There are various types of laboratories and instruments and equipment inside the experimental building. The power supply system not only maintains the specific environmental power consumption of the laboratory, but also meets the special power consumption requirements of various existing and future additional instruments. For instruments such as centrifuges, chromatography freezers and low-temperature refrigerators with compressors, the current required for their motors to start is often many times the working current, which often affects the voltage fluctuation of the circuit at the moment of starting, if there are many high-power instruments connected to the line, it will cause the instruments to work abnormally. Microelectronic instruments such as microbiological electricity tester, spectrophotometer, computer and the like have relatively high requirements on the quality of power supply. Frequent startup of high-power instruments will generate pulse voltage, which can easily damage components or cause reading fluctuation, data loss and other fault arrays. Therefore, the design of the experimental building power supply system, in addition to the need to reserve enough surplus power to meet the needs of future development, but also must provide uninterrupted power supply. Based on the uniqueness of the laboratory, the power supply system of the experimental building is unique in terms of power supply, wiring, lighting, safety and other aspects. The electricity consumption of experimental buildings is usually twice the existing electricity consumption.
What is a biosafety laboratory and what are the classification requirements?
Laboratory is a necessary place for scientific research. With the rapid development of modern biomedicine, many biopharmaceutical companies and medical institutions have established their own biosafety protection laboratories. With the increasingly stringent requirements for quality control, the demand for constant temperature environment is increasing, and the application field is becoming wider and wider.
How to reduce the cost and improve the utilization rate of laboratory water supply and drainage system design and installation?
Laboratory water supply and drainage system is composed of water supply part and drainage part, water supply system including laboratory water supply system, life water supply system and fire water supply system; drainage system should be based on the composition, nature, flow rate and discharge law of the wastewater discharged from the laboratory and set up the corresponding drainage system.